New resource – Annual Outdoor Water Calculator

CAGBC's Green Building Team on April 4, 2023

Rating System/Standard
LEED
LEED v4
LEED v4.1
Theme
Certification essentials

Would your project benefit from considering the annual irrigation need rather than the peak watering month?

While the LEED v4/4.1 Indoor Water Use Reduction calculator provides an annual determination of water needs for fixtures and fittings, the LEED v4/4.1 Outdoor Water Use Reduction Calculator only considers the peak watering month. The evaluation periods don’t match. The latter is therefore not helpful in determining the annual irrigation water needs for offsetting with alternative water supplies (such as rainwater) and considering cistern monthly drawdown calculations balanced with indoor fixture usage.

A new Annual Outdoor Water Use Reduction Calculator has been released allowing project teams to more accurately calculate watering needs over seasonal adjustments. This calculator was released to support water budgeting in the pilot Alternative Compliance Path 115 Whole Project Water Use Reduction. That said, this calculator can also be applied to any project considering alternative water needs for irrigation or simply wanting to better understand annual irrigation needs.

For a full listing of new and revised calculators, check out USGBC’s February update.

More News

Welcome to Building Lasting Change 2026

Over two decades ago, sustainability in buildings was still an emerging concept. Today,…
May 22, 2026

New opportunities to take extra credit for embodied carbon and other material improvements in LEED v5

LEED v5 Building Design and Construction (BD+C) and Interior Design and Construction (ID+C)…
May 21, 2026

The economic power of green buildings, at CAGBC’s annual conference

Canada’s premier green building event is back. Returning June 17–19 at the Centre…
May 20, 2026

Dive into ZCB at Building Lasting Change 2026

From June 17–19, the Canadian green building community will turn its attention to…
May 14, 2026